The Dorgont-Ulaanukhaa placer gold project in Bulgan Province, Mongolia is held by Batbroders Mining LLC (registration No. 6192939). The licence area lies on the Tuul River terrace in Dashinchilen Soum and is held under Special Mining Licence MV-022121 covering 269.28 hectares. Located within the North Khentii gold belt and Zaamar gold node, the project adopts open-pit placer mining; based on the 2015 geological report the estimated net gold content is about 1,321 kg with an average grade of about 1.68 g/m³. The 2022 and 2023 Environmental Management Plans have been prepared and implemented, and the project advances development and environmental compliance in accordance with the law.
The project is located on the terrace along the Tuul River in Dashinchilen Soum, Bulgan Province, about 65 km east-northeast of the soum centre. It is held by Batbroders Mining LLC (company registration No. 6192939) under Special Mining Licence MV-022121 covering 269.28 hectares, and is developed as an open-pit placer gold operation. The licence area sits within the North Khentii (Khoid Khentii) gold belt and the Zaamar gold node—a well-known placer gold district in Mongolia. Based on the 2015 geological report, the estimated gold content is about 1,523 kg (by gravity concentrate) / about 1,321 kg (net gold), with an ore volume of about 8.67 million m³; the mineral layer lies below 42–44.8 m depth, 0.8–7.6 m thick, with an average grade of about 1.68 g/m³ (range 0.43–2.66 g/m³). Open-pit placer mining with a single 10-hour shift, about 160 effective operating days per year, about 140 days of overburden stripping, plus about 20 days of preparatory works. The 2022 and 2023 Environmental Management Plans (EMP) have been prepared and implemented, covering climate and permafrost baseline, hydrology, soil and vegetation, flora and fauna protection, land rehabilitation and mine closure, resettlement compensation, accident risk and waste management, environmental budget and monitoring. The project advances development and environmental compliance in accordance with the law.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
This matter is progressing in line with the project stage; subsequent progress is subject to official updates.
The project has prepared 2022 and 2023 Environmental Management Plans covering land rehabilitation, mine closure, wildlife and vegetation protection and monitoring. Development and environmental compliance are being advanced in parallel.