The following is presented on a group-consolidated basis and updated as of August 2026. Status will be updated as procedures, financing, and construction advance.

Yuzhou coal mine
Yuzhou, Henan, ChinaFinancing in progress

Yuzhou coal mine

The project has filed coal reserves of ~7.69 Mt of high-calorific thermal coal, plus ~109 km² of exploration rights with further resource potential.

Designed capacity: c.450kt/year
Learn more ↗
Mianchi potassium feldspar mine
Mianchi, Henan, ChinaConstruction and procedures in progress

Mianchi potassium feldspar mine

The site is advancing access-road construction, with 8.10 Mt of identified potassium feldspar resources and reserve expansion to 3.0 Mt/year in progress.

Planned capacity: c.600kt/year
Learn more ↗
Mianchi Donggou barite mine
Mianchi, Henan, ChinaReserve expansion filing in progress

Mianchi Donggou barite mine

Located in Nancun Township, Mianchi, with 4.43786 Mt of barite resources and 4.07523 Mt of BaSO₄; reserve expansion is in progress.

Planned capacity: 300 kt/year
Learn more ↗
Gongyi aluminous clay mine
China · Shecun, Gongyi, HenanEPC selection and development preparation

Gongyi aluminous clay mine

Shecun No.2 mining district, Gongyi — CHALCO-held bauxite/clay mining right; identified resources about 2.98 Mt, approved capacity 300,000 t/year; central-SOE EPC contractor under selection.

Approved capacity 300,000 t/year
Learn more ↗
Mongolia coal mine project
MongoliaProcedures in progress

Mongolia coal mine project

The project company is advancing preliminary procedures and local coordination in accordance with applicable requirements.

Learn more ↗
Khentii 20MW solar PV + 15MW/40MWh storage project
Mongolia · Kherlen soum, Undurkhaan, KhentiiWon bid · Under construction

Khentii 20MW solar PV + 15MW/40MWh storage project

A winning project of Mongolia's first renewable auction (Project 5): 20MW PV + 15MW/40MWh storage, 25-year PPA at 7.8 US cents/kWh, grid connection targeted for 1 December 2026.

20MW PV · 15MW/40MWh storage
Learn more ↗
Ulaanbaatar ultra-low-energy prefabricated housing development
Ulaanbaatar, MongoliaPlanning, design & approvals in progress

Ulaanbaatar ultra-low-energy prefabricated housing development

Developed by Mongolia Runxin Investment Company, the project is advancing planning and real-estate approvals. Tsinghua University's School of Architecture is submitting Mongolia-specific building design standards for the SW ultra-low-energy prefabricated system used by the project for review by local authorities.

7 sites · 31 hectares · RMB 40m+ investment
Learn more ↗
3C, chips, and minerals trade
Cross-border businessOngoing

3C, chips, and minerals trade

Continuing to expand cross-border sourcing, sales, and delivery coordination across 3C products, chips, and minerals.

c.RMB 300m in 3C and chip trade
Learn more ↗
Dorgont-Ulaanukhaa Placer Gold Mine, Bulgan Province, Mongolia
Mongolia · Dashinchilen Soum, Bulgan Province (Tuul River terrace)Development & environmental compliance in progress

Dorgont-Ulaanukhaa Placer Gold Mine, Bulgan Province, Mongolia

A placer gold project in Dashinchilen Soum, Bulgan Province, Mongolia, held under Special Mining Licence MV-022121 (269.28 ha), within the North Khentii–Zaamar gold belt, open-pit placer mining with an estimated ~1,321 kg net gold.

269.28 ha licence area · ~1,321 kg gold (net)
Learn more ↗
Progress disclosure

Progress disclosure: terms such as "under construction," "permits in progress," "financing in progress" and "access-road construction" refer to different project stages and do not imply that a project is operational or generating returns.